All Posts

MINIMIZING ACCIDENT RATE AHEAD OF EID, BTP PADANG CONDUCTED SAFETY SOCIALIZATION

Padang-On Wednesday afternoon (19 April 2023) at level crossings, the Railway Engineering Center (BTP) Padang conducted safety socialization. This effort, in collaboration with PT KAI (Persero) Divre II West Sumatra, intends to re

Padang—Balai Teknik Perkeretaapian Kelas II Padang melalui Satuan Pelayanan Sawahlunto melakukan monitoring jalur kereta api dari Stasiun Sawahlunto menuju Stasiun Muaro Kalaban secara berkala mengg

BTP PADANG STRONGLY SUPPORTS SOCIALIZATION TO MINIMIZE ACCIDENTS AT LEVEL CROSSINGS

Padang-The Directorate General of Railways (DJKA) of the Ministry of Transportation (Kemenhub) of the Republic of Indonesia through the Railway Engineering Center (BTP) Class II Padang fully supports the Socialization and Trial Im

POST-REVITALIZATION, ALAI, AIR TAWAR, LUBUK BUAYA STATIONS START OPERATING

Padang-Three train stations in Padang City officially operated on Thursday, 16 March 2023 after the revitalization process carried out by the Class II Padang Railway Engineering Center (BTP) in 2022. The three stations are Alai, A

IN ENSURING FEASIBILITY, BTP PADANG CONDUCTS RAMPCHECK TO SUPPORT EID 2023 TRANSPORTATION

Padang-The Directorate General of Railways (DJKA) of the Ministry of Transportation through the Class II Padang Railway Engineering Center (BTP) made a number of preparations ahead of the 2023 Lebaran moment. The real step taken i